After wiring the inverter to the 120V load center, we were ready to wire up all of the A/C circuits. We have seen many bus conversions and RVs that only have a couple of A/C circuits. But, we would like to be able to cook something in the instant pot at the same time as running our air conditioner. And we would like to be able to wash a load of clothes at the same time as something is baking in the convection oven. You get the idea. So, we are separating out all of those circuits. In fact, we have decided on having eleven separate A/C circuits. Yes, that means running a lot more wire, but we think this will give us the most flexibility.
We bought 500 feet of marine grade 12-3 wire to run all 20 Amp circuits.
The first circuit we wired up was outlets in all of the bays. The first outlet is a GFCI, so all the other outlets will be protected by that one. We wanted to have access to an outlet in each bay in case we ever want to plug in a power tool or need to plug in a heat lamp in the water bay or something like that. Wiring up that first circuit went pretty smoothly, and we moved on to wiring up the next circuit, the engine heaters.
We have two heaters for the engine - these old 2-stroke Diesels like to be warm and cozy. So, we ran the wire from the circuit breaker in the front of the bus all they to the back, up into the back bedroom, up and over the wheel well, back down into the small electrical panel in the back, through a small service entry, and into the engine bay. We mounted a weatherproof outlet box with cover, wired up the outlet, and plugged in the heaters. We haven’t decided yet if we will just flip the breaker to turn them on when we need it, or if we will put them on a relay that we can then control remotely. I’m sure you can guess which way Juan is leaning on that one. (“Smart home all the things!” he thinks as he grins mischievously.)
Note: A huge benefit to working with marine cable is the flexibility it provides to bend and twist through the bays and up and around corners. However, because it is finely stranded and not solid wire like Romex, sometimes those little strands of wires have a mind of their own and want to splay out when being wired into a screw terminal. To alleviate that annoyance, we have been using ferrules. We also used a spade terminal on the ground wires for the outlets to help make a more secure connection under the screw.
Time to move “upstairs” into the “house”. When we were planning how to run all the wiring, we knew that we didn’t want to need to tear the bus apart to access any wires down the road. If we ever need to troubleshoot something in the wiring, we wanted to be able to get to them quickly.
So, we decided to run all the wires through the bays as far as possible before drilling a hole and sending the wire upstairs.
When we drilled holes in the aluminum bay walls through which to pass the wires, we put in service entry strain reliefs big enough for however many wires would be running through each bay. Some were large because we needed to pass through several wires. Others were smaller with only a few wires needed to pass through.
For the time being, we temporarily tacked up all the wires to the bay ceilings. We will eventually clean that all up with some type of cable management in order to keep it secure and safely attached up there.
One other thing we did was to label, label, label. With so many identical looking wires running through the bays, we labeled everywhere. We labeled each wire coming out of the load center box. We labeled each wire where it passed into a bay, in the middle of the bay, and again where it leaves a bay. If we ever need to hunt down the “Refrigerator” wire, for example, no matter which bay we are looking in for the wire, we will know exactly which one it is.
Last but not least, we put the cover on the load center and the A/C side is so close to being done. We will wire up the “house” outlets once the walls and everything is done. Still much to be done before then, but it feels so good to have all of these A/C circuits done.
Watch the video:
Click here If you cannot see the video.
Parts We Used
Square D QO 125 Amp 12-Space 12-Circuit Main Lug Indoor Load Center with Cover -
12/3 Marine Grade Cable from waytech.com Non-insulated Spade Terminals 12 AWG Ferrules Service Clamp Type Connectors 20 Amp QO Circuit Breaker P Touch Label Tape Noalox Anti-Oxidant Compound